The challenge
A regional food packer had a good problem. Orders grew 30%, and the owner’s first answer was a third shift. That meant new hires, new supervisors and a lot more payroll, so the owner asked us to check it was really needed. Hiring and training a third shift would have taken two months, and two large orders were already waiting.
On paper, the line ran at about two thirds of its rated speed. Nobody could say why. Supervisors blamed the machines. Maintenance blamed the schedule. The plant manager blamed the handover between shifts. Everyone had a story and nobody had a count.
What we did
We walked the floor for two weeks, across both shifts, with a stopwatch and a notebook. We counted every stop on the line and wrote down why it happened. Two stations sat too far apart, so product waited in a cart between them. Changeovers between products ran long because tools lived in three different places. We timed every changeover and wrote the fastest sequence on a card at each station.
We moved those two stations in one weekend. Then we rewrote how shifts hand over: one page, filled in by the outgoing lead and read aloud at the line. We ran it with every supervisor for three weeks, adjusting it each time it missed something, and left a short weekly check that the plant manager still uses.
The result
Cases packed per shift rose 22% within the ten weeks, on the same two shifts and the same people. The third shift was never needed. The owner kept the money set aside for it and spent part on a second labeler, the one piece of equipment the walk showed was a real limit. When we checked back at day 90, the gain had held. The shift leads say the scramble at the end of a shift has gone.
I was ready to hire a third shift. They showed me where the line was losing time, and most of it was two stations in the wrong place.
Teresa Brandt
Operations director, regional food packer